Waste & recovery

Recover more from what you already handle.

Identify and sort at line speed, route collection against current conditions, and know what each stream is actually worth — across every site you operate.

Line speed
Decision latency
Fast enough to divert.
Every site
Coverage
One view across all of them.
Continuous
Route re-planning
Not a weekly schedule.
99.99%
Availability
Contractual, measured monthly.
Why this matters

Material you failed to identify is material you were paid nothing for.

Recovery rates are set by what gets correctly identified in the fraction of a second available before it moves on. Every miss is both lost revenue and a disposal cost.

The economics of a recovery operation turn on decisions that have to be made at line speed, continuously, across every facility.

  • Identify at line speed, across every stream and every site
  • Re-route collection against current conditions rather than a fixed schedule
  • Know what each stream is worth, by site and by day
  • One view across every facility you operate

What this looks like in practice

Decision latencyLine speed
CoverageEvery site
Route re-planningContinuous
Availability99.99%
What you get

Everything the work needs. Nothing it doesn't.

The same platform, the same commitments, and the same control surface — whatever shape your work takes.

Capacity on demand

Ask for exactly what the work requires, for exactly as long as it needs. Nothing sits idle on your account waiting to be useful.

Scale without renegotiation

Grow by orders of magnitude on the same account and the same contract. There is no tier to graduate into and no conversation to schedule first.

Economics you can forecast

Know the cost before you commit, set a ceiling, and watch it hold. Every charge traces back to something you explicitly asked for.

Operational silence

Capacity arrives ready, monitored, and accounted for. Your specialists spend their attention on the problem rather than the plumbing beneath it.

A single control surface

Everything running, everything spent, and everything scheduled — in one view, across every region and team you operate.

Expertise on call

Engineers who have operated work at this scale, reachable in minutes, every hour of every day of the year.

Built for the work

Where waste & recovery teams put it to work.

Pick the shape of your work. The commitments underneath it do not change.

Decide before it moves on

Evaluate material at line speed so recovery is a decision rather than a statistic you compute afterwards.

Decision latencyLine speed
Stream coverageComplete
Availability99.99%
Peak-shift capacityHeld
What we guarantee

Promises with numbers attached.

Every commitment below is contractual, measured, and reported. None of them are aspirations.

99.99%

Availability, in writing

Measured monthly, reported openly, and backed by service credits large enough that we feel them before you do.

< 60s

Request to running

Capacity is allocated and working before a status meeting could finish discussing whether to ask for it.

15 min

A human, any hour

A named engineer engaged on a critical issue within fifteen minutes — every day of the year, without exception.

Zero

Surprise invoices

The ceiling you set is the ceiling we honour. Spend is visible to the hour and attributable to a team and a workload.

Trust & sovereignty

Built for the work you cannot afford to get wrong.

Regulated, classified, and clinical work runs here. The controls that make that possible are the same ones protecting everyone else.

Isolation by default

Your work runs in an environment that is yours. Separation is the starting condition, not an upgrade you discover you needed after an incident.

Data stays where you put it

Name the jurisdictions your work and data may occupy. That choice is enforced by the platform rather than recommended in a policy document.

Provable control

Every action on your account is recorded, attributable to a person, and exportable — so an audit is a report you run, not a project you staff.

Resilience as a discipline

Continuity is exercised continuously rather than assumed annually. We design for degradation long before a region gives us a reason to.

SOC 2ISO/IEC 27001ISO/IEC 27017ISO/IEC 27018HIPAAGDPRPCI DSSNIST SP 800-53

Controls are designed and operated against these frameworks. Current attestation reports are available under mutual NDA.

What changes

The first week feels like relief. The first quarter changes your plan.

Waste & recovery teams arrive wanting capacity. What they keep is the absence of a constraint they had stopped noticing — the quiet tax of deciding which work is worth the hardware.

Once that tax is gone, roadmaps get more ambitious rather than merely faster. The question stops being whether you can afford to try, and becomes which thing to try first.

  • Work nobody proposed before, because nobody expected approval
  • Delivery dates that survive contact with an ambitious quarter
  • Finance and engineering reading the same number, in the same place
  • Procurement cycles measured in minutes rather than fiscal quarters

What this looks like in practice

Decision latencyLine speed
CoverageEvery site
Route re-planningContinuous
Availability99.99%
Before you ask

Questions waste & recovery teams ask first.

Yes. Response envelopes hold under load and availability is contractual at 99.99%, including during your busiest shifts.
Start now

Your next idea should not have to ask permission.

Create an account and put real work on real capacity in the next few minutes. Or talk to an engineer first — either way, nobody is going to make you sit through a procurement cycle.

Create your accountTalk to an engineer
No minimum commitmentNo exit penaltyCapacity in under a minute