Distribution & wholesale

Forecast every line, in every location.

Plan inventory, price, and replenishment at the granularity the business actually operates at — per line, per site, per day — rather than at the category level that hides the decisions.

Every line
Forecast coverage
Per site, per day.
Daily
Refresh cadence
Not monthly.
Overnight
Full-catalogue turnaround
Ready for the morning.
Enforced
Spend ceiling
Per site.
Why this matters

Category-level planning hides exactly the decisions that cost money.

Distribution margin lives in the detail: the slow line in one depot, the seasonal spike in another, the substitution nobody modelled. Planning at category level averages all of it away.

Planning at line and site level has always been the obvious answer. The obstacle was never the idea; it was the cost of computing it often enough to act on.

  • Forecast per line and per site rather than per category
  • Refresh daily, so replenishment reflects this week
  • Run the full catalogue overnight instead of a sampled subset
  • Keep spend capped per site and attributable per workload

What this looks like in practice

Forecast coverageEvery line
Refresh cadenceDaily
Full-catalogue turnaroundOvernight
Spend ceilingEnforced
What you get

Everything the work needs. Nothing it doesn't.

The same platform, the same commitments, and the same control surface — whatever shape your work takes.

Capacity on demand

Ask for exactly what the work requires, for exactly as long as it needs. Nothing sits idle on your account waiting to be useful.

Scale without renegotiation

Grow by orders of magnitude on the same account and the same contract. There is no tier to graduate into and no conversation to schedule first.

Economics you can forecast

Know the cost before you commit, set a ceiling, and watch it hold. Every charge traces back to something you explicitly asked for.

Operational silence

Capacity arrives ready, monitored, and accounted for. Your specialists spend their attention on the problem rather than the plumbing beneath it.

A single control surface

Everything running, everything spent, and everything scheduled — in one view, across every region and team you operate.

Expertise on call

Engineers who have operated work at this scale, reachable in minutes, every hour of every day of the year.

Built for the work

Where distribution & wholesale teams put it to work.

Pick the shape of your work. The commitments underneath it do not change.

Forecast at the granularity you operate at

Run the full catalogue across every location overnight, so the morning’s replenishment decisions rest on current numbers.

GranularityLine and site
Catalogue coverageComplete
TurnaroundOvernight
RefreshDaily
What we guarantee

Promises with numbers attached.

Every commitment below is contractual, measured, and reported. None of them are aspirations.

99.99%

Availability, in writing

Measured monthly, reported openly, and backed by service credits large enough that we feel them before you do.

< 60s

Request to running

Capacity is allocated and working before a status meeting could finish discussing whether to ask for it.

15 min

A human, any hour

A named engineer engaged on a critical issue within fifteen minutes — every day of the year, without exception.

Zero

Surprise invoices

The ceiling you set is the ceiling we honour. Spend is visible to the hour and attributable to a team and a workload.

Trust & sovereignty

Built for the work you cannot afford to get wrong.

Regulated, classified, and clinical work runs here. The controls that make that possible are the same ones protecting everyone else.

Isolation by default

Your work runs in an environment that is yours. Separation is the starting condition, not an upgrade you discover you needed after an incident.

Data stays where you put it

Name the jurisdictions your work and data may occupy. That choice is enforced by the platform rather than recommended in a policy document.

Provable control

Every action on your account is recorded, attributable to a person, and exportable — so an audit is a report you run, not a project you staff.

Resilience as a discipline

Continuity is exercised continuously rather than assumed annually. We design for degradation long before a region gives us a reason to.

SOC 2ISO/IEC 27001ISO/IEC 27017ISO/IEC 27018HIPAAGDPRPCI DSSNIST SP 800-53

Controls are designed and operated against these frameworks. Current attestation reports are available under mutual NDA.

What changes

The first week feels like relief. The first quarter changes your plan.

Distribution & wholesale teams arrive wanting capacity. What they keep is the absence of a constraint they had stopped noticing — the quiet tax of deciding which work is worth the hardware.

Once that tax is gone, roadmaps get more ambitious rather than merely faster. The question stops being whether you can afford to try, and becomes which thing to try first.

  • Work nobody proposed before, because nobody expected approval
  • Delivery dates that survive contact with an ambitious quarter
  • Finance and engineering reading the same number, in the same place
  • Procurement cycles measured in minutes rather than fiscal quarters

What this looks like in practice

Forecast coverageEvery line
Refresh cadenceDaily
Full-catalogue turnaroundOvernight
Spend ceilingEnforced
Before you ask

Questions distribution & wholesale teams ask first.

Larger than you carry. Capacity scales to the catalogue rather than the catalogue being sampled to fit the capacity.
Start now

Your next idea should not have to ask permission.

Create an account and put real work on real capacity in the next few minutes. Or talk to an engineer first — either way, nobody is going to make you sit through a procurement cycle.

Create your accountTalk to an engineer
No minimum commitmentNo exit penaltyCapacity in under a minute